рус
еng
RRL calculation interval
Calculation of the BS coverage area
Authorization
Careers
Not registered user
поиск по сайту:
news archive
News
16.08.2016
Complex engineering systems server room "Gazpromneft NTC" at Tyumen, st. 50 October, d. 14
08.06.2016
Design and construction of 6 kV overhead line at the facility "Rotational residential town of" Krasnodargazstroy"
26.01.2015
The company `Telecom Industry` in November 2014 completed a project for the development of design documentation stage `Working documentation` to `LAN systems and radio communication` for the project: `Construction of a complex for the extraction, preparation, liquefied natural gas, LNG and gas condensate South Tambeyskoye GCM `
SOLUTION
Microwave Communication
Mobile Radio System
Вroadband wireless access
Automatic telephone communication
Multiplexing
Digital TV DTV
The power system
LAN
Structured cabling system
Fiber-Optic Communication Line
Automatic fire-extinguishing
Videoconferencing
CCTV
Security and fire alarm
Sealing of cable glands
Air conditioning
EQUIPMENT
Microwave Radio
Radio communication equipment
Broadband equipment
Multiplexing equipment
PABX
Equipment DTV
Еquipment Power Supplies
Active LAN equipment
Equipment SKS
Metal structures
Supply of metal
WORKS AND SERVICES
Design of data communication systems.
Delivery of communication equipment
Assembling and Erection Supervision works.
Starting and adjusting works (SAW).
ABOUT THE COMPANY
CONTACTS
Main
/ SOLUTION
SOLUTION
Automatic fire-extinguishing
Videoconferencing
CCTV
Microwave Communication
Mobile Radio System
Вroadband wireless access
Multiplexing
Automatic telephone communication
Digital TV DTV
The power system
LAN
Structured cabling system
Fiber-Optic Communication Line
Security and fire alarm
Sealing of cable glands
Air conditioning
+7 (495) 724 99 07, +7 (985) 724 99 77, факс +7 (916) 703 20 68