Main /
Complex engineering systems server room "Gazpromneft NTC" at Tyumen
As part of the project for the construction of complex engineering systems, server room for "Gazpromneft NTC" have been performed works including architectural and construction works, installation of cable channels, installation of raised Lindner’s floor, installation of lighting systems and general supply, structured cabling system . In addition, the bulk of the work amounted to specialized work: Automatic gas fire; uninterrupted power supply system, built on the domestic equipment of CJSC "Communication Engineering"; ventilation and air conditioning system involves the installation of 4 high-precision air-conditioning company «Stulz», supply installation with coarse and fine cleaning and heated supply air handling unit; monitoring system for collecting and monitoring the parameters of engineering systems based on the software Trace Mode 6 and programmable controllers «Pixel».
